Arquivos Mensais: julho 2012

Media Production Facility Architecture – Acoustical Simulations, Electroacoustics and Audio Monitor Systems

by Dirk Noy, Walters-Storyk Design Group (WSDG) After having studied issues such as site selection, layout consideration, defining and achieving appropriate sound isolation and well-balanced room acoustics for our dream media production facility we’re getting closer and closer to the end result. After a brief digression into acoustical simulations we’ll talk about the icing on [...]

2016-11-25T12:48:08+00:00julho 15th, 2012|Artigos|

Media Production Facility Architecture – Room-Within-Room Construction

by Dirk Noy, Walters-Storyk Design Group (WSDG) Maybe you remember - we’re still busy planning and building our dream media production facility – the basic issues of site selection and layout considerations were covered in the last article of this series. Today’s hot topic is defining and achieving appropriate sound isolation between the facility’s rooms [...]

2016-11-25T12:51:13+00:00julho 15th, 2012|Artigos|

WSDG Participates in AES 133rd Convention Broadcast Design Panel

A User’s Evaluation Of Integral Acoustic Products & Materials In an effort to maintain a timely and informative edge to the AES Broadcast Design Panel, moderator John Storyk has developed a new program for the 133rd Convention.  A panel of four leading studio contractors and installation experts will provide a real-world users survey of specific products and [...]

2012-07-03T12:56:48+00:00julho 3rd, 2012|Notícias|